Introduction

The Development Agreement is one of the most important legal documents in a housing society redevelopment project. It records the terms on which the cooperative housing society grants redevelopment rights to a selected developer and establishes the respective obligations, responsibilities and entitlements of the society and the developer.

A redevelopment project may involve substantial financial commitments, demolition of an existing building, temporary displacement of members, construction of new premises and the eventual delivery of permanent alternate accommodation. If the Development Agreement is incomplete, ambiguous or inadequately safeguards the members’ interests, the society may face serious difficulties during implementation.

The Maharashtra Government Order dated 30 September 2026 lays down important requirements concerning execution and registration of the Development Agreement, registration of individual Permanent Alternate Accommodation Agreements, bank guarantees, temporary accommodation, project completion timelines, carpet area, non-transferability of development rights and protection of existing members’ possession rights.

However, merely signing a document titled “Development Agreement” does not automatically protect the society or its members. The actual protection depends on the terms incorporated into the agreement, the accuracy of its schedules and annexures, and the enforceability of the obligations imposed on the developer.

This article explains the essential clauses, legal safeguards and documentation considerations that a cooperative housing society should address before executing a Development Agreement for redevelopment in Maharashtra, particularly in Pune.

1. What is a Development Agreement?

A Development Agreement is a legally binding contract between the cooperative housing society and the selected developer or contractor. It sets out the terms and conditions under which the developer undertakes redevelopment of the society’s property.

Depending on the legal structure of the project, the agreement may provide for:

  • Demolition of the existing building.
  • Development and utilisation of permissible Floor Space Index (FSI), Transferable Development Rights (TDR) and other development potential.
  • Construction of new premises for existing members.
  • Additional construction or sale component, wherever legally permissible.
  • Payment of corpus or other agreed monetary benefits.
  • Temporary accommodation or monthly transit rent for existing members.
  • Construction of common facilities, amenities and parking.
  • Completion of the redevelopment project within the agreed period.
  • Handover of permanent alternate premises to existing members.

The Development Agreement should clearly define the rights granted to the developer and the obligations that the developer must fulfil in consideration of those rights.

It should not leave material commercial or technical terms to be decided later through informal discussions.

2. Development Agreement and Permanent Alternate Accommodation Agreement (PAAA): Understanding the Difference

One of the most important aspects of redevelopment documentation is the distinction between the Development Agreement and the individual Permanent Alternate Accommodation Agreement.

These are separate documents serving different purposes.

A. Development Agreement

The Development Agreement is executed between the cooperative housing society and the developer.

It primarily governs the redevelopment relationship between these two parties, including:

  • The authority and rights granted to the developer.
  • The developer’s obligations towards the society.
  • The development potential of the property.
  • The construction obligations and specifications.
  • The project timeline.
  • The bank guarantee.
  • Transit accommodation arrangements.
  • Corpus and other agreed benefits.
  • Approvals and statutory compliance.
  • Default, termination and dispute resolution.

The society is the contracting party under this agreement. The document should therefore be drafted after considering the collective interests of all members and the resolutions passed by the General Body.

B. Permanent Alternate Accommodation Agreement

The Permanent Alternate Accommodation Agreement (PAAA) is an individual agreement between the developer and each existing member who is entitled to permanent alternate accommodation.

It records the specific accommodation and benefits promised to that member.

The PAAA should ordinarily identify:

  • The existing member and existing premises.
  • The member’s entitlement in the redeveloped building.
  • The carpet area of the new premises.
  • The floor and premises identification, where finalised.
  • Parking entitlement, if contractually agreed.
  • Corpus or other monetary benefits, where applicable.
  • Transit rent and deposit arrangements.
  • Construction and possession obligations.
  • The agreed specifications and amenities.
  • Other individual rights and obligations.

The PAAA is particularly important because it converts the member’s individual redevelopment entitlement into a documented contractual arrangement with the developer.

C. Are both documents necessary?

Yes. The 30 September 2026 Government Order expressly provides for registration of both the Development Agreement between the society and the developer and the individual PAAA.

It further provides that the PAAA should be executed within three months after registration of the Development Agreement.

The two documents are complementary. The PAAA does not replace the Development Agreement, and the Development Agreement should not be treated as a substitute for the individual PAAA.

Practical safeguard: The Development Agreement and the PAAA should be consistent with each other. If the Development Agreement promises a particular carpet area, rent, deposit or other benefit, the individual PAAA should accurately reflect the corresponding entitlement of the concerned member.

3. Execution of the Development Agreement Within Three Months

The 30 September 2026 Government Order provides that the Development Agreement should be executed with the selected developer or contractor within three months, in accordance with the terms approved by the General Body and under the guidance of the Architect or Project Management Consultant (PMC).

This requirement makes it important for the society to maintain a clear documentary record of the decisions taken during the developer-selection process.

Before execution, the society should verify that:

  1. The developer has been selected through the prescribed procedure.
  2. The terms approved by the General Body are accurately incorporated.
  3. The developer’s commercial offer and final commitments are documented.
  4. The project report and approved tender conditions have been considered.
  5. All material schedules and annexures are complete.
  6. The draft has been reviewed by the society’s independent legal adviser.
  7. The authorised signatories have the necessary authority to execute the agreement.

The society should not sign an agreement containing material changes from the terms approved by the General Body without obtaining appropriate approval through the prescribed process.

A material difference between the selected developer’s offer and the executed Development Agreement may create avoidable disputes and allegations of deviation from the General Body’s decision.

4. Description of the Property and Society’s Rights

The property description is a fundamental part of the Development Agreement.

The agreement should contain an accurate and complete description of the land and the existing building proposed to be redeveloped.

The description should include, wherever applicable:

  • Survey Number, Gat Number, CTS Number or other relevant property identification.
  • Village, Taluka and District.
  • Total land area.
  • Boundaries of the property.
  • Existing building details.
  • Number of buildings and wings.
  • Existing premises and their identification.
  • Common areas and facilities.
  • Title documents and conveyance particulars.
  • Property card, 7/12 extract, city survey records or other relevant revenue records.
  • Details of any lease, mortgage, charge, easement or other encumbrance.

The title and conveyance status should be examined before the agreement is executed.

If the society has not obtained conveyance of the land and building, the agreement should accurately record the existing legal position and identify the steps required to regularise or complete the title documentation.

The agreement should not casually describe the society as the absolute owner of the land if the title documents do not support that statement.

Practical safeguard: Attach a detailed property schedule and copies of relevant title documents. The property description in the Development Agreement should be consistent with the title documents and the records of the competent authority.

5. Grant of Development Rights and Their Non-Transferability

The Development Agreement should clearly specify the nature and extent of development rights granted to the developer.

These may include the right to:

  • Enter upon the property for authorised redevelopment activities.
  • Obtain necessary permissions and sanctions.
  • Demolish the existing building after fulfilment of contractual conditions.
  • Undertake construction in accordance with approved plans.
  • Utilise permissible FSI and TDR.
  • Construct and deal with the developer’s sale component, subject to applicable laws and the agreement.
  • Complete the project and hand over the members’ premises.

The agreement must clearly distinguish between the society’s entitlement and the developer’s entitlement.

A. Society’s entitlement

The agreement should contain a detailed schedule identifying the premises and benefits that are to be provided to existing members.

It should not merely state that the developer will provide “equivalent or additional area” without defining the actual entitlement.

B. Developer’s entitlement

The developer’s entitlement should also be specifically identified.

This may include the sale component, additional premises, commercial premises, parking or other benefits that the developer is entitled to retain or sell, subject to the approved project and applicable laws.

The agreement should specify the basis on which such entitlement is calculated and identify the plans or project documents on which it is founded.

C. Non-transferability of development rights

The 2026 Government Order expressly provides that the development rights granted to the developer shall be non-transferable.

Accordingly, the agreement should contain a clear clause prohibiting the developer from assigning, transferring or otherwise passing on the development rights granted under the agreement to another developer or third party.

Any permitted engagement of architects, consultants, contractors, agencies or subcontractors for carrying out specific work should be distinguished from a transfer of the development rights themselves.

The developer should remain fully responsible for the performance of the agreement, even where it engages contractors or other agencies.

Practical safeguard: Avoid vague clauses allowing the developer to transfer the entire project or its contractual rights to any third party at its discretion. Any legally permissible change in the project structure should be examined separately and should not defeat the non-transferability requirement.

6. Project Report, Approved Plans and Annexures

The Development Agreement should not be drafted in isolation from the project report, tender documents and approved commercial offer.

The following documents should be examined and, wherever appropriate, incorporated as annexures:

  1. Society’s property and title documents.
  2. Existing building and premises details.
  3. Approved project report.
  4. Developer’s final offer.
  5. Comparative statement and relevant tender conditions.
  6. Schedule of members and their existing premises.
  7. Member-wise entitlement statement.
  8. Proposed plans and layouts, where available.
  9. Construction specifications.
  10. List of amenities and common facilities.
  11. Parking arrangement.
  12. Project implementation schedule.
  13. Transit accommodation and rent schedule.
  14. Bank guarantee details and agreed conditions.

The agreement should clearly identify which documents form part of the contract.

If there is any inconsistency between the Development Agreement and an annexure, the agreement should specify which provision will prevail and how the inconsistency will be resolved.

Approved plans

The 2026 Government Order requires the plans approved by the Municipal Corporation or competent authority to be presented before the General Body for information.

Members should be able to understand the approved project, including the proposed building configuration, premises, common areas and amenities.

The agreement should also provide for delivery of copies of approved documents to members upon written application and payment of the prescribed fee, as contemplated by the Government Order.

7. Carpet Area of Permanent Alternate Accommodation

The carpet area of the new premises is one of the most commercially significant terms of a redevelopment agreement.

The Government Order specifically requires the carpet area payable under the agreement to be clearly mentioned in accordance with the Real Estate (Regulation and Development) Act, 2016.

The agreement should not use vague descriptions such as:

  • Built-up area.
  • Super built-up area.
  • Saleable area.
  • Approximate area.
  • Loading-inclusive area.

The entitlement should be expressed in terms of RERA carpet area, wherever applicable.

The agreement should clearly record:

  • Existing premises identification.
  • Existing area, with its basis of measurement.
  • Agreed additional area, if any.
  • Total RERA carpet area of the new premises.
  • Treatment of balconies, flower beds, terraces or other appurtenant spaces, wherever relevant.
  • Whether any additional area is subject to separate consideration.
  • Consequences if the actual constructed area is less than the agreed entitlement.

The definition of carpet area under RERA should be followed wherever the Act applies. Areas that are excluded from the statutory definition should not be casually added to the carpet area figure.

Avoid ambiguity in area commitments

Suppose a member is entitled to a new flat of 750 sq. ft. RERA carpet area.

The Development Agreement and the member’s PAAA should both specify the same entitlement and the same measurement basis.

The developer should not be permitted to satisfy this obligation by offering an equivalent built-up or saleable area without a clear contractual basis.

Practical safeguard: A member-wise entitlement schedule should be annexed to the Development Agreement and reproduced or accurately incorporated into the corresponding PAAA.

8. Bank Guarantee: Security Against Developer Default

A bank guarantee is an important financial safeguard for the society.

The 2026 Government Order provides that the General Body should decide the proportion of the total project cost for which the developer must furnish a bank guarantee and the form in which it should be furnished.

The Government Order does not prescribe a universal fixed percentage. Therefore, the society should not assume that a particular percentage is automatically mandatory under the 2026 order.

The amount and structure of the guarantee should be determined after considering:

  • Estimated project cost.
  • Value and scale of the project.
  • Developer’s financial capacity.
  • Transit rent obligations.
  • Construction commitments.
  • Project duration.
  • Risk of delay or abandonment.
  • Cost of completing the project through another developer in the event of default.

Essential bank guarantee clauses

The Development Agreement should specify:

  1. The amount of the bank guarantee.
  2. The issuing bank and acceptable banking criteria.
  3. The date by which it must be furnished.
  4. The validity period.
  5. The requirement for renewal or extension.
  6. Circumstances in which the society may invoke it.
  7. The procedure for invocation.
  8. The obligation to maintain the guarantee until the agreed stage of completion.
  9. Consequences of failure to renew or replace it.
  10. Whether the guarantee is unconditional and payable on demand, subject to its actual wording.

The guarantee should be issued in favour of the society in accordance with the agreed terms.

The society should independently verify the authenticity of the bank guarantee with the issuing bank. A photocopy or an informal confirmation from the developer should not be treated as sufficient verification.

Practical safeguard: The agreement should prohibit the developer from allowing the bank guarantee to expire while material contractual obligations remain outstanding, unless an agreed replacement security has been furnished and accepted by the society.

9. Temporary Accommodation and Transit Rent

Redevelopment usually requires existing members to vacate their premises and temporarily relocate.

The 2026 Government Order provides that the developer should arrange alternative accommodation, preferably in the same area, until completion of the project. Alternatively, the developer may arrange agreed monthly rent and deposit or provide transit camps.

The agreement should specify the exact arrangement selected by the parties.

A. Alternative accommodation

If the developer provides temporary accommodation, the agreement should identify:

  • Location.
  • Type and size of accommodation.
  • Duration of availability.
  • Responsibility for maintenance and utility charges.
  • Conditions for occupation.
  • Consequences if the accommodation becomes unavailable.

The phrase “suitable alternative accommodation” should not be left undefined.

B. Monthly transit rent

If monthly rent is agreed, the agreement should clearly state:

  • Monthly rent payable to each member.
  • Date from which rent becomes payable.
  • Payment frequency.
  • Mode of payment.
  • Annual escalation, if agreed.
  • Responsibility for taxes or other charges, where applicable.
  • Consequences of delayed payment.
  • Duration of rent liability.
  • Additional period or compensation in case of delayed possession.

C. Security deposit

Where a deposit is agreed, the amount, payment date and refund or adjustment mechanism should be specified.

D. Payment default

The agreement should provide a clear remedy if the developer fails to pay rent or deposit within the agreed time.

Possible contractual safeguards include:

  • Interest on delayed payments.
  • Notice and cure period.
  • Right to invoke agreed security.
  • Recovery of unpaid amounts.
  • Other remedies available under the agreement and applicable law.

The society should avoid accepting a clause that merely states that the developer will pay rent “as mutually decided” without specifying the amount and payment schedule.

10. Project Completion Timeline

The 2026 Government Order provides that the redevelopment project should ordinarily be completed within two years from the date of the first or foundation commencement certificate, as stated in the order.

In exceptional circumstances, the period should not exceed three years.

The agreement should reflect this requirement accurately.

It should not calculate the statutory timeline casually from the date of signing the Development Agreement or from the date on which members vacate the premises.

The agreement should define:

  • The commencement certificate relevant to the timeline.
  • The date from which the completion period will be calculated.
  • The contractual milestones.
  • The expected date of completion.
  • The process for monitoring progress.
  • The consequences of delay.
  • The conditions, if any, under which an extension may be recognised.

Recommended milestone schedule

The society may consider incorporating a milestone schedule covering:

  1. Submission of plans and applications.
  2. Obtaining necessary permissions.
  3. Issuance of commencement certificate.
  4. Vacating and handing over of the existing building.
  5. Demolition.
  6. Foundation and structural work.
  7. Completion of major construction.
  8. Internal finishing and services.
  9. Obtaining the Occupancy Certificate or other legally required completion approvals.
  10. Handover of permanent alternate premises.

Delay and default protection

The agreement should define what constitutes delay, what circumstances may qualify as force majeure and what remedies are available to the society and members.

A general clause stating that the developer will not be responsible for any delay due to circumstances beyond its control is inadequate.

The agreement should require the developer to establish the relevant circumstances and their actual impact on the project timeline.

It should also distinguish genuine force majeure events from delays arising out of the developer’s financial difficulties, poor planning, contractor disputes or failure to obtain permissions due to its own defaults.

11. Conditions Before Members Vacate Their Premises

This is a particularly important protection for existing members.

The 2026 Government Order expressly states that members should vacate their premises only after:

  1. All legal approvals required for redevelopment have been obtained; and
  2. The individual Permanent Alternate Accommodation Agreement has been registered.

The rights of persons who are in possession of their existing premises are to remain protected.

Therefore, the Development Agreement should not contain an unconditional obligation requiring members to vacate immediately upon its execution.

Recommended pre-vacation checklist

Before members are called upon to vacate, the society should verify:

  • Necessary statutory permissions and approvals.
  • Approved building plans.
  • Relevant commencement certificate.
  • Registration of the Development Agreement.
  • Registration of each concerned member’s PAAA.
  • Payment of agreed deposit and initial transit rent, where applicable.
  • Availability of agreed temporary accommodation.
  • Furnishing of the bank guarantee.
  • Insurance and safety arrangements.
  • Proper documentation of possession and inventory.

The exact list of approvals will depend on the project and the competent planning authority.

Practical safeguard: The agreement should expressly provide that failure to satisfy the agreed pre-vacation conditions will not constitute a default by the society or the members.

12. Registration of the Development Agreement and PAAA

The 2026 Government Order expressly requires the Development Agreement and individual PAAA to be registered under the Registration Act, 1908.

It further provides that individual PAAA should be executed within three months after registration of the Development Agreement.

Registration is important because the documents create and record legally significant rights and obligations relating to the redevelopment project and the members’ future premises.

The parties should ensure that:

  • The correct parties are identified.
  • The society’s resolution and authority to execute are documented.
  • The property description is accurate.
  • The consideration and contractual obligations are properly recorded.
  • All schedules and annexures are complete.
  • The documents are properly stamped.
  • The documents are presented before the competent Sub-Registrar.
  • Registration particulars are preserved by the society.

Stamp duty and registration implications should be examined under the applicable law and prevailing notifications at the time of execution. The parties should not assume that a particular concession, exemption or rate automatically applies to every redevelopment arrangement.

The society should obtain and preserve the registered document and its registration particulars.

13. Construction Specifications and Quality Standards

The Development Agreement should contain detailed construction specifications.

A broad statement that the developer will construct the building using “good quality material” is insufficient.

The specifications should cover, among other things:

  • Structural design and quality standards.
  • Foundation and structural framework.
  • Cement, steel and other major materials.
  • Flooring.
  • Doors and windows.
  • Electrical wiring and fittings.
  • Plumbing and sanitary fittings.
  • Waterproofing.
  • Elevators.
  • Fire safety systems.
  • Common lighting.
  • Staircases and lobbies.
  • Water supply and drainage.
  • Security systems.
  • External development and landscaping.
  • Common amenities.

Where particular brands, models or technical standards are promised, they should be specified clearly or supported by an annexure.

The agreement should also provide a mechanism for inspection and verification by the society’s Architect or PMC.

Defect liability

The agreement should specify the developer’s responsibility for rectifying defects in construction, workmanship, materials and services.

It should define:

  • The defect reporting process.
  • Inspection and verification.
  • Time allowed for rectification.
  • Responsibility for the cost of repairs.
  • Consequences if the developer fails to rectify defects.

The applicable statutory obligations under RERA and other laws, where relevant, should also be considered.

14. Occupancy Certificate and Handover of Possession

The developer’s obligation should not end merely because the physical construction appears complete.

The agreement should clearly specify the documents and approvals required before the new premises are handed over.

These may include, as applicable:

  • Occupancy Certificate.
  • Completion Certificate.
  • Approved as-built plans.
  • Fire safety approvals.
  • Lift-related approvals.
  • Water and electricity connection records.
  • Relevant completion and compliance documents.
  • Warranty and maintenance information.
  • Manuals for common equipment.
  • Records relating to common facilities.

The agreement should provide for joint inspection before possession.

Members should be given an opportunity to identify incomplete work, defects or deviations from the agreed specifications.

The handover process should include a written possession letter and a record of keys, meters, fixtures and other relevant items.

The agreement should also address the transfer and maintenance of common facilities and building systems.

15. Parking, Common Areas and Amenities

Parking and common facilities are frequent sources of disagreement in redevelopment projects.

The Development Agreement should clearly define the parking arrangement and the rights of existing members.

It should identify:

  • Number and type of parking spaces.
  • Allocation methodology.
  • Whether parking is covered, open or mechanical.
  • Location and identification of parking spaces.
  • Visitor parking, if agreed.
  • Access and circulation areas.
  • Common amenities.
  • Recreation areas.
  • Open spaces.
  • Gardens and other common facilities.

The agreement should not permit the developer to alter the promised common facilities or parking arrangements unilaterally.

Any changes required due to statutory approvals should be documented and dealt with through an agreed process, while protecting the members’ contractual entitlements.

The legal character and permissible treatment of parking spaces should also be examined under applicable laws and judicial decisions. The agreement should not casually describe every parking space as an independently saleable unit.

16. Corpus Fund and Other Financial Benefits

If the developer has offered corpus, hardship compensation, shifting charges or other financial benefits, the Development Agreement should record each benefit separately.

For every payment, specify:

  • Amount payable.
  • Person entitled to receive it.
  • Payment date.
  • Payment mode.
  • Conditions, if any.
  • Consequences of non-payment.
  • Whether the amount is one-time or recurring.

Avoid expressions such as “corpus as mutually agreed” or “other benefits as discussed” unless the amount and terms are subsequently recorded in an enforceable document.

A member-wise statement of financial benefits should be annexed wherever the benefits differ between members.

The agreement should also address the society’s entitlement to any common fund or other collective financial benefit.

17. Insurance, Indemnity and Third-Party Claims

The Development Agreement should allocate responsibility for insurance and third-party claims arising during the redevelopment project.

The developer should be contractually required to maintain appropriate insurance policies, as applicable to the project.

These may include:

  • Contractor’s All Risk insurance.
  • Public liability insurance.
  • Workmen compensation or employee-related insurance.
  • Insurance for construction-related risks.
  • Other policies required under applicable laws or prudent project practice.

The agreement should also contain an indemnity clause addressing losses, claims, damages and liabilities arising from the developer’s breach, negligence, statutory non-compliance or acts of its contractors and personnel.

The scope of indemnity should be carefully drafted. It should not be so broad that it becomes uncertain, nor should it exclude liabilities that the developer is legally required to bear.

18. Developer’s Statutory Compliance and MahaRERA

The Development Agreement should require the developer to obtain and maintain all approvals, permissions and registrations applicable to the redevelopment project.

Depending on the nature and structure of the project, these may include permissions from:

  • The Municipal Corporation or planning authority.
  • Fire authorities.
  • Environmental authorities, where applicable.
  • Water and drainage authorities.
  • Electricity distribution authorities.
  • Other competent departments.

MahaRERA applicability

The Real Estate (Regulation and Development) Act, 2016 should be examined in relation to the specific redevelopment project.

It would be incorrect to assume that every redevelopment project is automatically required to be registered with MahaRERA, or that every redevelopment project is automatically exempt.

Section 3 of RERA contains the registration framework and specified exemptions. In particular, the exemption concerning renovation, repair or redevelopment under Section 3(2)(c) is subject to the statutory condition that the project does not involve marketing, advertising, selling or new allotment of any apartment, plot or building.

Where the redevelopment project includes a sale component or other activity attracting RERA registration requirements, the developer should comply with the applicable provisions.

The agreement should identify the party responsible for:

  • Determining RERA applicability.
  • Obtaining registration, where required.
  • Maintaining the registration.
  • Making statutory disclosures.
  • Complying with project-related obligations.
  • Providing relevant information to the society.

The society should obtain independent confirmation of the project’s RERA position rather than relying solely on the developer’s assertion.

19. Restrictions on Conflicts of Interest

The 2026 Government Order expressly provides that no managing committee member or office bearer of the society, or any of their relatives, should be the developer.

The society should ensure compliance with this requirement and maintain appropriate declarations and records.

The Development Agreement and the redevelopment documentation should also avoid arrangements that create undisclosed conflicts of interest.

Any consultancy, brokerage, commission or other financial arrangement connected with the redevelopment project should be examined transparently and documented in accordance with applicable law and the decisions of the General Body.

20. Termination, Default and Consequences of Breach

The Development Agreement should provide a clear mechanism for dealing with serious contractual defaults.

It should identify events that may constitute default, including:

  • Failure to furnish the bank guarantee.
  • Failure to obtain necessary permissions within agreed periods.
  • Failure to commence construction.
  • Abandonment of the project.
  • Persistent delay without a legally or contractually acceptable justification.
  • Failure to pay transit rent or other agreed amounts.
  • Insolvency or inability to perform contractual obligations.
  • Unauthorised transfer of development rights.
  • Material deviation from approved plans or contractual specifications.
  • Material breach of the agreement.

Notice and cure period

The agreement should specify the procedure for issuing a default notice and the time allowed to remedy the breach.

Not every breach should automatically result in termination. The agreement may distinguish between curable and non-curable defaults.

Termination consequences

If termination becomes necessary, the agreement should address:

  • The society’s right to terminate in accordance with the contract and applicable law.
  • Invocation of the bank guarantee, where contractually and legally permissible.
  • Outstanding transit rent and other unpaid dues.
  • Responsibility for securing the site and incomplete construction.
  • Handover of plans, approvals and project records.
  • Rights relating to materials and work already executed.
  • Cooperation required for appointment of a replacement developer.
  • Claims, compensation and other remedies.

The agreement should not contain a one-sided termination clause that gives the developer extensive rights while leaving the society without meaningful remedies.

The enforceability of termination and the remedies available will depend on the contract, facts and applicable law.

21. Force Majeure

A force majeure clause deals with exceptional events that may prevent or materially delay contractual performance.

The agreement should define the events that qualify and specify the procedure for invoking the clause.

It should cover:

  • Notice of the event.
  • Supporting evidence.
  • Steps to mitigate its impact.
  • Duration of the relief.
  • Effect on the project timeline.
  • Consequences if the event continues beyond a specified period.

The clause should not allow ordinary commercial difficulties, lack of funds, contractor disputes or poor project management to be treated automatically as force majeure.

The society should ensure that the developer cannot use a broadly worded force majeure clause to avoid payment of transit rent or other obligations without a proper contractual and legal basis.

22. Dispute Resolution and Jurisdiction

The 2026 Government Order requires the agreement to contain a condition providing for disputes arising in the redevelopment project to be taken before the competent court or authority in accordance with the applicable laws.

The Development Agreement should therefore identify the dispute-resolution framework without attempting to exclude statutory remedies available to the society or its members.

The clause should address:

  • Disputes between the society and developer.
  • Disputes concerning interpretation of the agreement.
  • Disputes relating to construction and delay.
  • Disputes concerning individual member entitlements.
  • Disputes falling within the jurisdiction of statutory authorities.
  • Other remedies available under applicable laws.

A contractual clause cannot confer jurisdiction on a forum that does not have jurisdiction under the governing statute.

The agreement should therefore be drafted with reference to the applicable provisions of cooperative law, RERA and other relevant legislation.

23. Allocation of Flats in the Redeveloped Building

The 2026 Government Order contains a specific procedure for allotment of premises in the redeveloped building.

It provides for a Special General Body Meeting with at least 14 days’ notice to all members.

The allotment decision is to be made by a majority of not less than 51% of the society’s total membership present at the meeting.

The order further provides that:

  • As far as possible, allotment should be made floor-wise in accordance with the existing position of members.
  • Where a lottery becomes necessary, the developer should arrange the lottery after completion of the building.
  • The society should video-record the allotment meeting.
  • The minutes, video recording and certified allotment list should be submitted to the Registrar’s office within one month.

The Development Agreement should incorporate these requirements and should not give the developer unrestricted discretion to allot premises to members.

The agreement should also specify how the final premises identification and allotment schedule will be documented and communicated to each member.

24. Membership of New Premises Holders

The 2026 Government Order places responsibility on the society’s managing committee to decide applications for membership from holders of new flats or commercial premises within three months after completion of the redevelopment project or receipt of possession, as stated in the order, and to issue share certificates.

The Development Agreement should provide for the developer to supply the information and documents reasonably required by the society to process such applications.

This may include:

  • Details of new premises.
  • Allotment records.
  • Possession records.
  • Relevant approved plans.
  • Information concerning purchasers of the developer’s sale component.
  • Other documents necessary for membership processing.

The agreement should also deal with the handover of records relating to the new building and its premises.

25. Important Schedules and Annexures to the Development Agreement

A well-drafted Development Agreement should not depend entirely on its main clauses. The schedules and annexures are equally important.

The following documents should be considered for incorporation, as applicable:

Schedule / AnnexureParticulars
Schedule IDetailed description of the land and property
Schedule IIExisting building and premises details
Schedule IIIList of existing members and their premises
Schedule IVMember-wise permanent alternate accommodation entitlement
Schedule VCorpus, rent, deposit and other financial benefits
Schedule VIDeveloper’s entitlement and sale component
Schedule VIIConstruction specifications and amenities
Schedule VIIIParking and common facilities
Schedule IXProject implementation and milestone schedule
Schedule XBank guarantee particulars
Schedule XIApproved plans and relevant permissions, as available
Schedule XIIOther documents forming part of the agreement

The schedules should be checked for internal consistency.

For example, the member-wise entitlement schedule should match the individual PAAA. The construction specifications should match the approved project documents. The developer’s entitlement should not overlap with the society’s entitlement.

26. Legal Review Before Execution: A Practical Checklist

Before the society executes the Development Agreement, the managing committee should ensure that the following matters have been reviewed.

Property and title

  • Property description matches the title documents.
  • Conveyance and ownership status has been examined.
  • Encumbrances and third-party rights have been disclosed.
  • Existing premises and member details have been verified.

Commercial and technical terms

  • Developer’s final offer is accurately incorporated.
  • Society’s entitlement is clearly defined.
  • Developer’s entitlement is separately defined.
  • RERA carpet area is specified.
  • Construction specifications are annexed.
  • Parking and amenities are documented.
  • Project timeline and milestones are specified.

Financial safeguards

  • Bank guarantee amount and terms are recorded.
  • Transit rent and escalation are specified.
  • Deposit and payment dates are specified.
  • Corpus and other benefits are clearly documented.
  • Remedies for non-payment are provided.

Legal safeguards

  • Development rights are non-transferable.
  • Conditions before members vacate are clearly recorded.
  • Registration of DA and PAAA is addressed.
  • Statutory approvals and compliance responsibilities are allocated.
  • Insurance and indemnity clauses are included.
  • Delay, default and termination provisions are adequate.
  • Dispute-resolution provisions comply with applicable law.
  • All schedules and annexures are complete.
  • The draft has been independently vetted by a lawyer representing the society.

27. Common Mistakes Societies Should Avoid

The following mistakes can create serious difficulties during redevelopment:

1. Signing a generic Development Agreement

A standard template may not reflect the society’s title position, project structure, commercial terms or individual member entitlements.

2. Leaving important terms for future discussion

Carpet area, rent, corpus, deposit, bank guarantee and construction specifications should not be left vague.

3. Confusing the DA with the PAAA

The Development Agreement and individual PAAA serve different purposes. Both should be executed and registered as required.

4. Permitting members to vacate before the prescribed safeguards are in place

The Government Order requires the relevant legal approvals and registration of the individual PAAA before members vacate.

5. Accepting an inadequately drafted bank guarantee

The society should examine the amount, validity, issuing bank and invocation conditions.

6. Not defining the developer’s entitlement

Ambiguity about the sale component, FSI, TDR, parking and other development rights may create future disputes.

7. Ignoring the consequences of delay

The agreement should contain clear contractual remedies for delay and default.

8. Failing to attach schedules

A Development Agreement without accurate schedules and annexures may create uncertainty about the parties’ actual obligations.

9. Allowing unilateral changes

The developer should not be given unrestricted power to alter the project, member entitlements or approved specifications.

10. Not obtaining independent legal advice

The developer’s lawyer represents the developer’s interests. The society should have its own independent legal adviser to examine the agreement before execution.

28. Frequently Asked Questions

Q1. Is a Development Agreement compulsory for housing society redevelopment?

The 30 September 2026 Government Order provides for execution of a Development Agreement between the society and the selected developer or contractor. It also requires registration of that agreement.

Q2. Within what period should the Development Agreement be executed?

The Government Order provides that the Development Agreement should be executed within three months, in accordance with the General Body-approved terms and under the guidance of the Architect or PMC.

Q3. Is an individual PAAA also required?

Yes. The Government Order provides for individual Permanent Alternate Accommodation Agreements between the developer and the concerned members. These agreements must also be registered.

Q4. Within what period should the PAAA be executed?

The Government Order provides that the PAAA should be executed within three months after registration of the Development Agreement.

Q5. Can members be asked to vacate immediately after registration of the Development Agreement?

No. The Government Order provides that members should vacate only after all necessary legal approvals have been obtained and their individual PAAA has been registered.

Q6. What percentage of bank guarantee is mandatory?

The 2026 Government Order does not prescribe a universal fixed percentage. It provides that the General Body should decide the proportion of the total project cost and the form of the bank guarantee.

Q7. From which date is the redevelopment completion period calculated?

The Government Order refers to the date of the first or foundation commencement certificate. The ordinary period should not exceed two years, and in exceptional circumstances it should not exceed three years.

Q8. Can the developer transfer the redevelopment project to another developer?

The 2026 Government Order expressly provides that the development rights granted to the developer are non-transferable. The agreement should reflect this requirement.

Q9. Is the carpet area of the new flat required to be specified?

Yes. The Government Order specifically requires the carpet area payable under the agreement to be clearly mentioned in accordance with RERA.

Q10. Is the Development Agreement sufficient to establish a member’s individual entitlement?

The Development Agreement records the society-developer arrangement. The individual member’s permanent alternate accommodation entitlement should also be documented in the member’s registered PAAA.

Q11. Can the society terminate the Development Agreement if the developer fails to perform?

The agreement should contain appropriate default and termination provisions. The society’s rights will depend on the contractual terms, applicable law and facts of the particular case.

Q12. Does every redevelopment project require MahaRERA registration?

Not necessarily. Applicability depends on the project structure and the provisions of RERA, including the conditions for exemption under Section 3(2)(c). The society should obtain a project-specific legal assessment.

Conclusion

The Development Agreement is the foundation of the legal and commercial relationship between a cooperative housing society and its redevelopment developer. It should protect the society’s collective interests while clearly documenting the individual entitlements of its members.

The 30 September 2026 Government Order provides important safeguards concerning the execution and registration of the Development Agreement and PAAA, bank guarantees, temporary accommodation, project timelines, carpet area, non-transferability of development rights and protection of members before they vacate their existing premises.

However, the effectiveness of these safeguards depends on accurate drafting and proper implementation.

A society should not treat the Development Agreement as a routine formality to be signed after selecting a developer. It should be treated as the principal legal instrument governing the entire redevelopment arrangement.

Before execution, the society should obtain an independent review of the property title, project report, commercial offer, member-wise entitlement, technical specifications, financial security and contractual remedies.

A carefully drafted Development Agreement can substantially reduce ambiguity, protect members’ rights and provide a legally structured framework for successful redevelopment.


Related Articles in This 13-Part Redevelopment Guide

  1. Part 1: Housing Society Redevelopment in Maharashtra: The Complete Step-by-Step Roadmap
  2. Part 2: 2019 vs 2026 Government Order: What Has Changed in Maharashtra Housing Society Redevelopment?
  3. Part 3: Before You Begin: Legal, Structural and Financial Checks Before Housing Society Redevelopment
  4. Part 4: Special General Body Meeting for Redevelopment: Notice, Quorum, Voting and Legal Requirements
  5. Part 5: Role of Architect and PMC in Housing Society Redevelopment
  6. Part 6: Tender Process for Housing Society Redevelopment: Rules, Transparency and Developer Offers
  7. Part 7: Developer Selection in Housing Society Redevelopment: Registrar’s Authorised Officer and Voting Procedure
  8. Part 8: Developer Due Diligence: How a Housing Society Should Verify a Redeveloper
  9. Part 9: Development Agreement and PAAA: Protecting Members’ Rights in Redevelopment
  10. Part 10: From Demolition to Possession: Construction, Approvals and Handover
  11. Part 11: Self-Redevelopment and Group Redevelopment in Maharashtra
  12. Part 12: Dissenting, Absent, Deceased and NRI Members in Housing Society Redevelopment
  13. Part 13: Housing Society Redevelopment FAQs, Legal Checklist and Glossary
  14. Download Maharashtra Government GR सगृयो-2026/प्र.क्र.108/14-स for Re-Development dated 30/09/2026

Legal Disclaimer: This article is intended for general legal information and educational purposes. The application of redevelopment laws, development control regulations, RERA and registration requirements depends on the facts, title position, project structure and applicable permissions of each society. A society should obtain independent legal and technical advice before approving or executing redevelopment documents.